Local school operating revenue per membership pupil means a district’s local school operating revenue divided by the district’s membership excluding special education pupils. Virginia Stormwater Management Program or “VSMP” means a program approved by the State Board after September 13, 2011, that has been established by a locality to manage the quality and quantity of runoff resulting from land-disturbing activities and shall include such items as local ordinances, rules, permit requirements, annual standards and specifications, policies and guidelines, technical materials, and requirements for plan review, inspection, enforcement, where authorized in this article, and evaluation consistent with the requirements of this article and associated regulations. Total Development Cost means the total of all costs incurred in the completion of a Development, all of which shall be subject to the review and approval by the Credit Underwriter and the Corporation pursuant to this rule chapter, and as further described in Rule 67-48.0075, F.A.C. Nightclub means an establishment that provides Percent or "percentage" means the percentage by weight. Transient lodging means a room or a suite of rooms. Stacked townhouse means a building, other than a townhouse or apartment building, containing at least 3 dwelling units, each dwelling unit being separated from the other vertically and/or horizontally, and each dwelling unit having an entrance to grade shared with no more than 3 other units Total means the sum of all individual pesticides detected and quantified in the monitoring procedure, including their relevant metabolites, degradation and reaction products.Īdjusted Total turnover means the turnover in a State or a Union territory, as defined under sub-section (112) of section 2, excluding the value of exempt supplies other than zero-rated supplies, during the relevant period Lowest price for each contractor responding to the mini-bid will be determined by calculating the sum of the Total NYS Contract Price for Mini-Bid for all vehicles bid (i.e., the Grand Total NYS Contract Price of Vehicles Bid). The Contractor’s proposal with the highest Grand Total Score will be selected as the apparent successful contractor. The Grand Total Score for each Prospective Contractor, which is the sum of the Technical Score and Cost Score, will be used to determine the ranking of proposals. The Commonwealth will make the award(s) on Grand Total basis to the lowest responsive and responsible bidder. REIMBURSABLES PER ACTIVITY Activity No: Name: No.DescriptionUnitQuantityUnit PriceTotal Amount1.Air travelTrip 2Road travelKms3.Rail travelKms4.Subsistence AllowanceDay Grand Total 6. The Prospective Contractor’s proposal with the highest Grand Total Score will be selected as the apparent successful Contractor. The Waltham Purchasing Department desires to award a single contract based on the Grand Total Price.Ībove mentioned price includes 17% Sale Tax (Please tick Yes or No) YesNo Grand Total Terms & Conditions 1. The Technical Score and Cost Score will be added together to determine the Grand Total Score for the proposal. Calculate the percentage from your institution’s IPEDS Completions by using the sum of 1st and 2nd majors for each CIP code as the numerator and the sum of the Grand Total by 1st Majors and the Grand Total by 2nd major as the denominator.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |